Product details
Recommended for any machine never serviced, or left some time between services, always recommended for second hand equipment, or older equipment. This is done off site with a FREE working loan machine +/- grinder provided during the process ( approx. 10-14 days), this service consists of:
- Complete strip down of machine.
- Full Boiler Descaling Treatment.
- Replace Group Head Seals.
- Replace Group Head Gaskets.
- Replace Steam Arm Seals.
- Replace Water Valve Seals.
- Replace Group Head Shower Plates.
- Replace Anti Vac Valves.
- Replace Boiler Pressure Safety Valve (Certified).
- Replace Worn Valve Rubbers.
- Back Flushing Of The Group Head Itself.
- Adjust Grinder / Reset Drink Settings If Necessary.
- Scale Removal & Clean Water Ports.
- Replace Coils, Solenoid & Probe.
- Basic training of staff on how to clean & maintain the machine, if required.
- Advice on condition of the machine and parts & recommend future replacements when necessary.